- Factory cleared of redundant equipment, fixtures and fittings. Offices cleared of all redundant furnishings, fixtures and fittings.
- Extensive enabling works for asbestos removal.
- Non notifiable asbestos removal – 4500 square metres asbestos cement double layered roofing materials, 2700 square metres thermoplastic floor tiles.
- Major notifiable licensed asbestos removal work including strip out of 2500 square metres of AIB ceilings in offices.
- Demolition of all structures and disposal from site of all arising materials excluding hardcore. Hardcore stockpiled.
- Concrete floor slabs and building foundations – No current requirement to excavate below ground level.